YTL Power and JLand campus at Sedenak Tech Park West
Announced YTL Power | Sedenak Tech Park West, Ibrahim Technopolis (IBTEC), Johor
Colocation
- Capacity
- 1,300 to 1,500 MW Planned build-out, MBSB Research estimate reported by W.Media. YTL and JLand say only gigawatt scale. [1] August 2026
- 1,200 MW Planned build-out, 145-acre purchase could support this, as reported by NST [5] August 2026
- 3,000 MW Planned build-out, Possible with option over up to 400 more acres, as reported by NST [5] August 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Proposed joint development. SIPP Power to buy about 145 acres with an option on up to 400 more, about 545 acres total. Land comes from JLand Group; price and timeline are not disclosed. Capacity figures are press and analyst reporting, not company filings.
Sources differ: The companies state no MW figure. MBSB Research estimates 1,300 to 1,500MW. RHB Research, via The Edge in October 2026, linked the first 145 acre plot to up to 400MW.
Sources
-
[1] W.Media: YTL Power and JLand to partner to build up to 1.5GW data center in Johor, 20 August 2026
-
[2] YTL Power International: YTL Power and JLand Group collaborate on new gigawatt scale data centre campus at Sedenak Tech Park, 19 August 2026
-
[3] The Star: YTL Power, JLand to develop data centre campus, 20 August 2026
-
[4] The Edge Malaysia: Potential data centre business listing fuels interest, October 2026
-
[5] New Straits Times: YTL Power shares up 63pct this year, but analysts aren't calling time, 26 August 2026
-
[6] EdgeProp: YTL Power to develop new gigawatt data centre campus in Johor, 20 August 2026
-
[7] The Edge Malaysia: YTL Power to develop new gigawatt data centre campus in Johor, 19 August 2026
-
Bandar Teknologi Maju Perlis AI data centre
Planned Sirage Skyvast Holdings Sdn Bhd, Joint venture of Sirage Capital Sdn Bhd and Skyvast Sdn Bhd, with Perlis State Secretary Incorporation under MoU | Chuping Valley Industrial Area, Chuping, Padang Besar, Perlis
AI or GPU focused
- Capacity
- 1,250 MW Planned build-out, Up to 1.25GW off-grid AI data centre [1] November 2024
- Investment
- RM49 billion, Wider 600 acre township including energy assets; also reported as US$11 billion [2][1] January 2025
- Go-live
- Phased operations expected by mid 2027 expected [1] November 2024
MoU stage. No 2026 milestone such as financing, groundbreaking or power approval was found. Planned energy assets are not data centre load.
Sources
-
[1] EdgeProp: Bandar Teknologi Maju Perlis to offer over 2,000 jobs in technology fields, says Fahmi, November 2024
-
[2] MIDA: Bandar Teknologi Maju Perlis set to drive digital economy growth, 15 January 2025
-
YTL Green Data Center Park
Operating YTL Power | Kulai, Johor
ColocationAI or GPU focused
- Capacity
- 80 MW Basis not stated, DC5, under construction [1] August 2026
- 120 MW Basis not stated, DC11, under construction [1] August 2026
- 1,200 MW Planned build-out, Raised from 500MW, per NST [1][3][4] October 2026
- 1,000 MW Planned build-out, Raised from 600MW, per The Edge [2] August 2026
- 298 MW Basis not stated, Contracted as at March 2026, not the same as live capacity [4][2] October 2026
- 48 MW IT load, JDC1 planned IT load, per MIDF Research in December 2024 [6] December 2024
- 72 MW Total capacity, JDC1 planned facility load, per MIDF Research [6] December 2024
- 20 MW IT load, JDC2 AI data centre for Nvidia GB200, per MIDF Research [6] December 2024
- Investment
- Part of the programme: YTL Power AI programme
- Go-live
- Another 200MW by June 2027, RHB expectation expected [1] August 2026
Most advanced phase is JDC1, live since May 2024. Sea is JDC1 anchor tenant with 32MW offtake. Current total live MW is not published. NST reports 600MW of supply agreements signed and 150MW operational across YTL sites.
Sources differ: Planned park size differs: The Edge and EdgeProp gave 1,000MW, raised from 600MW, while YTL and NST gave 1.2GW, up from 500MW.
Sources
-
[1] New Straits Times: YTL Power shares up 63pct this year, but analysts aren't calling time, 26 August 2026
-
[2] The Edge Malaysia: YTL Power to develop new gigawatt data centre campus in Johor, 19 August 2026
-
[3] YTL Power International: YTL Power and JLand Group collaborate on new gigawatt scale data centre campus at Sedenak Tech Park, 19 August 2026
-
[4] The Edge Malaysia: Potential data centre business listing fuels interest, October 2026
-
[5] YTL Power International: YTL to Advance AI Development in Malaysia in Collaboration with NVIDIA, 8 December 2023
-
[6] The Edge Malaysia: MIDF Research: YTL Power on track to deliver data centres, with second 8MW under Johor Data Centre 1 to come online by year end, 16 December 2024
-
NCT Smart Industrial Park data centre
Planned Not disclosed | NCT Smart Industrial Park, Tanjung Dua Belas, Kuala Langat, Selangor
Colocation
- Capacity
- 800 MW Planned build-out, Up to 800MW expected capacity of proposed facility [1][3] May 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Term sheet only. Buyer unnamed, so operatorHq reflects the seller and type is unconfirmed. NCT World signed a non-binding term sheet to sell 100 acres. Depends on definitive agreements and approvals. Price undisclosed.
Sources
-
[1] EdgeProp: NCT World signs term sheet for 100 acre land sale at NCT Smart Industrial Park for data centre development, 11 May 2026
-
[2] Media Selangor: No data centre approval in Selangor if water, electricity supply insufficient, 8 September 2026
-
[3] w.media: NCT sells 100-acre land in Malaysia for 800 MW data center, 12 May 2026
-
DPS Data Centre 1, Lendu
Planned DPS Energy Sdn Bhd (DPS Resources Bhd), DPS Resources Bhd | Mukim Lendu, Alor Gajah, Melaka
AI or GPU focused
- Capacity
- 150 to 180 MW Planned build-out, First phase target under Xinfengwei MoU [1][2] May 2026
- 500 to 1,000 MW Planned build-out, Proposed site capacity under CEIG MoU [3] August 2026
- Investment
- RM4.36 billion, Indicative value based on 150MW; also stated as US$1.1 billion [1][2] May 2026
- Go-live
- Not disclosed
Non-binding MoUs only: Hangzhou Xinfengwei (Alibaba affiliate) in April 2026 and China Energy unit CEIG in August 2026. Includes proposed 500MW gas plant.
Sources differ: Site size is 253 acres in EdgeProp, about 250 acres in W.Media and 345 acres in The Star.
Sources
-
[1] EdgeProp: DPS Resources bets on RM4.36b AGI data centre to unlock Melaka landbank acquired for RM45.6m just three years ago, 30 April 2026
-
[2] W.Media: Malaysia-based DPS inks MOU with Alibaba affiliate for potential US$ 1 billion AI data center in Melaka, 4 May 2026
-
[3] The Star: DPS Resources units to collaborate with China Energy to develop data centres in Melaka, 14 August 2026
-
FutureData Park
Announced FutureData Sdn Bhd, Consortium of TSG Group (Sarawak) and Cyclect Group (Singapore) | FutureGreen District, Kota Samarahan, Sarawak
ColocationAI or GPU focused
- Capacity
- 17 MW Basis not stated, First facility, for offtaker Global Telecommunications Group [1][2] April 2026
- 500 MW Planned build-out, Site total as stated in October 2024 [1][2] April 2026
- 200 MW Planned build-out, Park size as stated at June 2023 launch [3][4] June 2023, Older figure
- Investment
- US$130 million, More than this figure, for the first 17MW facility only [1][2] April 2026
- Go-live
- Online by 2026 (target set in 2024); construction was scheduled to start Q2 2025 expected [1][2] April 2026
Newest evidence of progress is about two years old. No source found confirms construction began or the first facility is live.
Sources differ: Planned size rose from 200MW (2023) to 500MW (2024). Location is Kota Samarahan in 2023 sources and Kuching in 2024 sources. The Invest Sarawak page is dated 2026-04-23 but its text reads as October 2024.
Sources
-
[1] TSG Group: Sarawak's FutureData welcomes 1st Offtaker: A 17MW Data Center, 9 October 2024
-
[2] Invest Sarawak: Global Telecommunications first off-taker for Kuching's FutureData Park, 23 April 2026
-
[3] TSG Group: Launch of FutureData Sdn Bhd, a Sarawak-Singapore consortium to develop 200MW Green Data Centre, 21 June 2023
-
[4] Malay Mail: Borneo's first major data centre to be set up in Kota Samarahan, will also be carbon neutral, 22 June 2023
-
Google campus, Springhill Industrial Park, Port Dickson
Under construction Google, Pearl Computing Malaysia | Springhill Industrial Park, Port Dickson, Negeri Sembilan
Hyperscaler, own use
- Capacity
- 500 to 1,000 MW Planned build-out, Planned campus, per W.Media [4] April 2026
- Investment
- Part of the programme: Google Malaysia investment 2027 and 2028
- Go-live
- Q1 2028 first package; Q2 2028 second package (targets) expected [7][8] August 2026
Google named this park in November 2026. Pearl Computing, a Google affiliate, bought about 389 acres from Gamuda. Gamuda has construction contracts here for a US technology client, including RM1.72 billion in April 2026 and RM1.71 billion in August 2026. Google states no capacity.
Sources differ: Gamuda names its client only as a US technology company. Linking those contracts to this site is reported by W.Media and analysts, not by Gamuda.
Sources
-
[1] w.media: Google to build US$160 million water facilities in Negeri Sembilan, Malaysia, 2 November 2026
-
[2] Mingtiandi: Google Commits $15B to Malaysia Expansion as First Data Centre Goes Live, 5 November 2026
-
[3] Free Malaysia Today: Google to share RM651mil PD water project with local community, 2 November 2026
-
[4] W.Media: Gamuda scores US$ 430 million hyperscale buildout in Port Dickson, Malaysia, 21 April 2026
-
[5] W.Media: Negeri Sembilan's first two data centers construction on track, 30 April 2025
-
[6] The Star: Latest DC job win shores up Gamuda's outlook, 21 April 2026
-
[7] Malay Mail: Gamuda unit bags RM1.72b contract to build hyperscale data centre in Port Dickson, 17 April 2026
-
[8] The Star: Gamuda bags RM1.71bil data centre job in Port Dickson, 5 August 2026
-
[9] MIDA: Gamuda buys land from MUI Properties-Chin Teck JV for RM424m cash for data centre project, 30 December 2024
-
[10] NST: Gamuda's RM1.71bil data centre win signals stronger margins, 6 August 2026
-
[11] The Edge Malaysia: Gamuda lands another RM3.57 bil in hyperscale data centre jobs in Port Dickson, 28 August 2026
-
[12] New Straits Times: Construction awards seen matching RM49bil record on infrastructure pipeline, 16 July 2026
-
[13] PublicInvest Research via i3investor: Gamuda Berhad - Secures RM3.57bn Data Centre Building Job, 1 September 2026
-
Nexus Yang Green Data Centre Campus
Under construction Vena Nexus, Vena Group | NS Semiconductor Valley Industrial Park, Seremban, Negeri Sembilan
ColocationAI or GPU focused
- Capacity
- 350 MW IT load, Initial target IT load, about 350MW [1] January 2026
- 450 MW Basis not stated, Figure in The Star's state feature [2] October 2026
- Investment
- RM20 billion, Long term capital investment, estimated, in phases [1] January 2026
- Go-live
- Q1 2027 (Bernama); current phase by June 2027 (The Star) expected [1][2] October 2026
Ground broken January 2026 on 157 acres. Bernama calls it a hyperscale campus; tenants not named.
Sources differ: Capacity is 350MW IT load per Bernama and 450MW per The Star. Completion is Q1 2027 per Bernama and June 2027 for the current phase per The Star.
Sources
-
[1] Bernama: Nexus Yang Green Data Centre Campus groundbreaking, 26 January 2026
-
[2] The Star: Negri Sembilan primed for next phase of growth, 8 October 2026
-
DPS Bukit Rambai data centre
Planned Shantawood Sdn Bhd (DPS Resources Bhd), DPS Resources Bhd | Bukit Rambai Industrial Area, Melaka
Colocation
- Capacity
- 89 MW Planned build-out, Up to 89MW proposed [1][2] August 2026
- 400 MW Planned build-out, Potential expansion [2] August 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Non-binding MoUs with Hangyue and CEIG on a 20 acre factory site. Application submitted to the Data Centre Task Force; state support letter received.
Sources
-
[1] EdgeProp: DPS unit signs non-binding MoU with China's Hangyue for proposed 89MW Melaka data centre, 9 August 2026
-
[2] The Star: DPS Resources units to collaborate with China Energy to develop data centres in Melaka, 14 August 2026
-
Vantage KUL2
Under construction Vantage Data Centers, Vantage Data Centers | Cyberjaya, adjacent to KUL1, Selangor
Colocation
- Capacity
- 256 MW Planned build-out, IT capacity at full build-out, 10 facilities [1][2] June 2023, Older figure
- 400 MW Planned build-out, Over 400MW total capacity, second Cyberjaya campus, as reported December 2025 [3] December 2025
- Investment
- US$3 billion, Reported as US$3 billion, also RM13.32 billion [1][2] June 2023, Older figure
- Go-live
- Not disclosed
Groundbreaking August 2024 on nearly 35 acres. Second source calls it the second Cyberjaya campus without the KUL2 name.
Sources differ: 2023 plan gives 256MW IT. December 2025 press gives over 400MW total capacity for the second campus. Bases differ, so both are kept.
Sources
-
[1] Free Malaysia Today: Vantage Data Centers to open RM13.3bil data centre campus in Cyberjaya, 16 May 2023
-
[2] Frontier Enterprise: Vantage eyes $3 billion layout for data centres in Malaysia, 9 June 2023
-
[3] w.media: Vantage Data Centers completes Cyberjaya campus with launch of fully leased 16MW fourth facility, 5 December 2025
-
[4] Business Wire: Vantage Data Centers Breaks Ground on 256MW Cyberjaya Campus, 6 August 2024
-
K2 Kulai campus (JHR01-03 and JHR04)
Operating K2 Strategic, Kuok Group | Kulai, Johor (Sedenak Tech Park), Johor
Colocation
- Capacity
- 60 MW IT load, JHR01-03 [1][2] Page undated, read November 2026
- 24 MW IT load, JHR04 [1][3] Page undated, read November 2026
- 234 MW Planned build-out, Designed IT capacity across JHR01-03 and JHR04 [1][4] Page undated, read November 2026
- 300 MW Planned build-out, Day ultimate gross power in 2023 TNB deal [5] September 2023, Older figure
- Investment
- Not disclosed
- Go-live
- JHR01-03 ready for service 2024; JHR04 listed for 2025 live [1] Page undated, read November 2026
The Edge calls both existing data centres in October 2026. JHR04 live status is not separately confirmed. 59 acre campus.
Sources differ: Designed capacity is 234MW IT on K2's site and in The Edge, against 300MW gross power in the 2023 TNB report. K2 pages say Kulai, W.Media says Sedenak Tech Park.
Sources
-
[1] K2 Strategic: Malaysia, Page undated, read November 2026
-
[2] K2 Strategic: JHR01-03, Page undated, read November 2026
-
[3] K2 Strategic: JHR04, Page undated, read November 2026
-
[4] The Edge Malaysia: IJM said to have bagged K2 data centre construction job, October 2026
-
[5] W.Media: K2 and TNB Secure Power Deal for K2's Hyperscale Data Center Campus in Johor, 15 September 2023
-
PDG JH2
Announced Princeton Digital Group | Eco Business Park, Mukim Senai, Johor
ColocationAI or GPU focused
- Capacity
- 300 MW Planned build-out, Planned five building campus [1] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
PDG lists the site as planned. EcoWorld names PDG as a QUANTUM Edge occupier, but no source confirms that plot is JH2. No construction evidence found.
Sources
-
[1] Princeton Digital Group: Why Malaysia?, Page undated, read November 2026
-
[2] EcoWorld: EcoWorld sells 49.588 acres at QUANTUM Edge, Kulai to a hyperscale data centre operator, for RM280.8 million, 25 April 2026
-
Vantage JHB1
Operating Vantage Data Centers, Vantage Data Centers | Sedenak Tech Park, Johor
ColocationHyperscaler, own use
- Capacity
- 300 MW Planned build-out, More than 300MW IT across three data centres when fully developed [1] November 2025
- 200 MW Planned build-out, Original Yondr plan, 2022 [2] March 2022, Older figure
- 98 MW IT load, First data centre [3] June 2025
- 25 MW IT load, First phase, handed over [3] June 2025
- 24 MW Basis not stated, First phase as reported by Mingtiandi [4] September 2025
- Investment
- Not disclosed
- Go-live
- First phase handed over by June 2025 live [3][4] September 2025
Bought from Yondr, completed November 2025. Mingtiandi understands Oracle leased the first 98MW for 15 years. About 73 acres. More than $900m project financing. Source writes $ only and it is not total project cost.: US$900 million.
Sources differ: First phase is 25MW IT in W.Media and 24MW in Mingtiandi. Mingtiandi reported a $1.6 billion purchase price in talks, while the completion report gives US$1.6 billion as the Asia Pacific equity raise and no campus price.
Sources
-
[1] W.Media: Vantage Data Centers completes purchase of Yondr's 300MW data center in Johor; closes US$1.6B investment in APAC, 24 November 2025
-
[2] PR Newswire: Yondr Group launches 200MW hyperscale data center project in JCorp's Sedenak Tech Park, Malaysia, 28 March 2022
-
[3] W.Media: Yondr Group delivers its first data center in Asia Pacific six months early, 5 June 2025
-
[4] Mingtiandi: Vantage set to buy Yondr's Oracle leased Malaysia data centre, 5 September 2025
-
NTT DATA Gelang Patah campus
Planned NTT DATA | Gelang Patah, Johor Bahru, Johor
Colocation
- Capacity
- 48 MW Basis not stated, First building [1] December 2024
- 290 MW Planned build-out, Six buildings on 27.7 ha [1] December 2024
- Investment
- Not disclosed
- Go-live
- First building planned April 2027 expected [1] December 2024
Tropicana land sale, RM383.13m, 68.457 acres (The Edge). Build plan not stated. Newest evidence from August 2024, over two years old. Reported December 2024 as a proposed land acquisition. No newer update found, so evidence is nearly two years old.
Sources
-
[1] W.Media: NTT Data to Build 290MW Data Center in Johor Bahru, 9 December 2024
-
[2] The Edge Malaysia: Tropicana sells Johor land to Japanese data centre player for RM383m, 26 August 2024
-
AirTrunk JHB3 and JHB4
Announced AirTrunk, Blackstone | Iskandar Puteri, close to JHB1 and JHB2, Johor
Colocation
- Capacity
- 280 MW IT load, More than 280MW of IT load, JHB3 and JHB4 combined [1][2] May 2026
- Investment
- RM12 billion, RM12 billion across JHB3 and JHB4, reported as US$3 billion [1][2] May 2026, part of a wider programme, not added to the site total
- Part of the programme: AirTrunk Malaysia investment, JHB1 to JHB4
- Go-live
- Not disclosed
Announced April 2026. Sources give only combined figures for the two campuses, so they share one entry.
Sources
-
[1] NST: AirTrunk to invest RM12bil in two new Johor hyperscale data centres, 1 May 2026
-
[2] W.Media: AirTrunk to invest US$ 3 billion in Johor to build two hyperscale campuses totaling 280MW capacity, 30 April 2026
-
TM Nxera AI-ready data centre campus, Iskandar Puteri
Under construction TM Nxera, Telekom Malaysia 51%, Nxera (Singtel) 49% | Iskandar Puteri (Nusajaya), Johor
ColocationAI or GPU focused
- Capacity
- 64 MW Basis not stated, First phase [1][2] April 2026
- 200 MW Planned build-out, TM says scalable capacity of more than 200MW [3] January 2026
- 280 MW Total capacity, Multi-year TNB electricity supply agreement [3][4] January 2026
- Investment
- RM9 billion, About RM9 billion [1] April 2026
- Go-live
- First phase targeted 2H 2026 expected [1] April 2026
Groundbreaking July 2024, topped out April 2026. No source found confirming go-live by November 2026, when residents raised concerns over dust and noise.
Sources differ: The 200MW design scale and 280MW power agreement differ. Sources do not reconcile them, and the 280MW is a power supply figure.
Sources
-
[1] Light Reading: TM Nxera data center campus in Johor on track for 2H 2026 rollout, 17 April 2026
-
[2] MIDA: TM, Singtel's Nxera break ground for state-of-the-art AI-ready data centre campus in Johor, 25 July 2024
-
[3] Telekom Malaysia: TM Nxera green data centre campus, 22 January 2026
-
[4] EdgeProp: Telekom Malaysia secures power supply for data centre in Johor, 14 January 2026
-
[5] Malay Mail: TM Nxera says Iskandar Puteri data centre has required approvals, sustainability measures amid Johor residents' concerns, 3 November 2026
-
AirTrunk JHB2
Announced AirTrunk, Blackstone | Iskandar Puteri, adjacent to JHB1 on former SILC land, Johor
ColocationAI or GPU focused
- Capacity
- 270 MW Basis not stated, More than 270MW [1][2] July 2026
- Investment
- Part of the programme: AirTrunk Malaysia investment, JHB1 to JHB4
- Go-live
- Not disclosed
Announced February 2025. IFC calls it greenfield; newer reports call it existing and contracted, and none confirms construction or live status. Funding secured for JHB2, not total project cost: US$2.3 billion.
Sources
-
[1] IFC: AirTrunk Johor project 52336, 13 July 2026
-
[2] MIDA: AirTrunk to build second data centre in Johor, combined cost of two facilities at RM9.7bil, 14 February 2025
-
[3] DCD: APAC data center firm AirTrunk secures $2.3bn in funding for JHB2 campus in Johor Bahru, Malaysia, 29 July 2026
-
EdgeConneX Cyberjaya campus
Under construction EdgeConneX, EdgeConneX | Cyberjaya, Selangor
Colocation
- Capacity
- 200 MW Planned build-out, Over 200MW, nine buildings on 30 acres, as announced in 2023 [1] September 2023, Older figure
- 270 MW Planned build-out, Described by EdgeConneX as a 270MW project in June 2025 [2] June 2025
- Investment
- Not disclosed
- Go-live
- First phase scheduled for Q1 2026 expected [2] June 2025
First phase was 70 percent complete in June 2025. No source read confirms it went live.
Sources differ: 2023 announcement says over 200MW. EdgeConneX's June 2025 post says 270MW. Both kept; the later one may be an updated plan.
Sources
-
[1] TelecomTalk: EdgeConneX Enters Malaysia With Plans to Build Nearly 300 MWs of Data Center Capacity, 12 September 2023
-
[2] EdgeConneX: Cyberjaya scales as a regional data center hub, 25 June 2025
-
STACK Infrastructure JHB01
Announced STACK Infrastructure | Iskandar Puteri, Johor Bahru, Johor
Colocation
- Capacity
- 120 MW Basis not stated, First building [1][2] August 2025
- 220 MW Planned build-out, Two facilities, 120MW and 100MW [1][2] August 2025
- Investment
- RM7 billion, Stated by a minister; W.Media could not confirm it is this same site [1] August 2025
- Go-live
- First phase targeted Q4 2026 expected [1][2] August 2025
10.8 ha campus announced January 2025. No report confirms construction has started, or that the RM7 billion figure refers to this campus.
Sources
-
[1] W.Media: STACK Infrastructure to invest US$ 1.66 billion in data center in Johor: Zafrul, 20 August 2025
-
[2] DCD: Stack expands into Malaysia, plans 220MW campus in Johor, 14 January 2025
-
Global Data Infrastructure data centre, COMPASS @ Kota Seri Langat
Announced Global Data Infrastructure Sdn Bhd, Global Telecommunications Group | COMPASS @ Kota Seri Langat, Kuala Langat, Selangor
Colocation
- Capacity
- 210 MW IT load, Planned IT load, with 300 MVA power capacity [1] July 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Approvals in principle secured. Construction expected after the land deal completes. DCD reports a 36 acre parcel. Price undisclosed.
Sources
-
[1] New Straits Times: COMPASS @ Kota Seri Langat fully taken up with 210MW data centre deal, 8 July 2026
-
[2] DCD: Malaysia's Global Telecommunications Group buys 36-acre parcel for 210MW data center in Selangor, Malaysia, 8 July 2026
-
AIMS 200MW AI data centre, Cyberjaya
Announced AIMS Data Centre, Time dotCom and DigitalBridge funds | Cyberjaya, Selangor
ColocationAI or GPU focused
- Capacity
- 200 MW Planned build-out, Up to 200MW, subject to final engineering confirmation [1] February 2026
- Investment
- RM4 billion, Reported as RM4 billion [1] February 2026
- Go-live
- Completion expected in 2027 expected [1] February 2026
Land deal for about 10 acres closed February 2026. No groundbreaking report found.
Sources
-
[1] EdgeProp: AIMS closes land deal to build RM4 bil data centre in Cyberjaya, 6 February 2026
-
Empyrion MY1
Announced Empyrion Digital | Nusajaya, Johor
Colocation
- Capacity
- 200 MW Planned build-out, Full campus [1] December 2025
- Investment
- Not disclosed
- Go-live
- First building targeted Q4 2026 expected [1] December 2025
Empyrion Digital plans five 40MW buildings on the MY1 campus, with the first phase energised in September 2026.
Sources
-
[1] DCD: Empyrion eyes 200MW data center campus in Johor, Malaysia, 9 December 2025
-
PDG JH1
Operating Princeton Digital Group | Sedenak Tech Park, Kulai, Johor
ColocationAI or GPU focused
- Capacity
- 200 MW Planned build-out, Current full campus figure, four buildings [1][2] November 2026
- 170 MW Basis not stated, Stated in August 2025 with three buildings [3] August 2025
- 150 MW Planned build-out, Original campus plan, 2023 to 2024 [4][5] July 2024, Older figure
- 52 MW Basis not stated, Phase 1, completed [5] July 2024, Older figure
- Investment
- RM2 billion, Announced investment at land purchase, 2023 [4] May 2023, Older figure
- US$280 million, 2024 green loan, stated as MYR 1.276 billion [5] July 2024, Older figure
- Go-live
- Phase 1 completed by July 2024 live [5] July 2024
Building 3 topped out and Building 4 broke ground by December 2025. On 12.5 hectares bought from JLand. Green financing for continued development, November 2026, about MYR 5.1 billion as stated by the source: US$1.3 billion.
Sources differ: Campus size has moved from 150MW to 170MW to 200MW across PDG statements. Phase 1 was planned at 60MW in 2023 and delivered at 52MW. Financing figures are debt, so they may overlap the 2023 investment figure.
Sources
-
[1] The Asian Banker: Affin Bank, HSBC, Maybank, OCBC, Standard Chartered and UOB underwrite $1.3 billion green financing for PDG's Johor data centre campus, 4 November 2026
-
[2] W.Media: PDG tops out 3rd building and broke ground on 4th building on 200MW Johor campus, 17 December 2025
-
[3] Princeton Digital Group: Princeton Digital Group becomes first operator in Asia Pacific to earn OCP Ready v2 for Hyperscale certification, 6 August 2025
-
[4] New Straits Times: Princeton Digital Group invests RM2bil to develop data centre in Johor, 22 May 2023
-
[5] DataCenterNews Asia: PDG completes phase one of AI-ready data centre in Johor, 11 July 2024
-
[6] Princeton Digital Group: Why Malaysia?, Page undated, read November 2026
-
[7] W.Media: PDG secures US$ 1.3 billion green loan for Johor data center expansion, Page undated, read November 2026
-
Digital Cosmos Cyberjaya site
Planned Digital Cosmos | Cyberjaya, Sepang, Selangor
Colocation
- Capacity
- 182 MW Total capacity, At least 182MW power approval is a condition of the land sale [1] August 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
MRCB unit conditional land sale, RM419.05m, 36.66 acres, due Q4 2027 (EdgeProp). Conditions also need at least 9.41 million litres of water daily.
Sources
-
[1] EdgeProp: MRCB proposes RM419.05 mil Cyberjaya land sale for data centre development, 7 August 2026
-
STT Johor campus
Under construction ST Telemedia Global Data Centres (STT GDC), KKR and Singtel consortium | Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor
Colocation
- Capacity
- 16 MW IT load, First building, STTGDC JHB1 [1] Page undated, read November 2026
- 166 MW Planned build-out, Up to 166MW of IT load, August 2026 [2] August 2026
- 136 MW Planned build-out, Development potential on STT GDC's Johor location page [1] Page undated, read November 2026
- 120 MW Planned build-out, Earlier 2023 and 2025 IT load target [3][4] February 2025
- Investment
- Not disclosed
- Go-live
- JHB1 expected 2027 expected [1] Page undated, read November 2026
Over 22 acres. STT GDC lists the campus as under development. KKR and Singtel completed their purchase of STT GDC on 2 Sep 2026. Green financing facility of up to US$1.37 billion (MYR 5.6 billion), not total cost: US$1.37 billion.
Sources differ: Campus potential appears as 166MW, 136MW and 120MW on different STT GDC or press pages. JHB1 go-live was end 2026 per itnews (Feb 2025) and 2027 on the current location page.
Sources
-
[1] STT GDC: Johor location page, Page undated, read November 2026
-
[2] STT GDC: STT GDC deepens Malaysia commitment with up to USD 1.37 billion green financing for STT Johor campus, 13 August 2026
-
[3] iTnews Asia: STT GDC launches construction of hyperscale data centre in Malaysia, 24 February 2025
-
[4] TelecomTalk: STT GDC to Develop Second Data Centre Campus in Malaysia, 10 November 2023
-
AirTrunk JHB1
Operating AirTrunk, Blackstone | Southern Industrial and Logistics Cluster (SILC) land, Iskandar, Johor Bahru, Johor
Colocation
- Capacity
- 150 MW Basis not stated, More than 150MW, fully contracted [1][2] July 2026
- Investment
- Part of the programme: AirTrunk Malaysia investment, JHB1 to JHB4
- Go-live
- July 2024 live [2][3] April 2026
Hyperscale campus adjacent to JHB2. JHB1 and JHB2 together exceed 420MW of IT load and are almost fully contracted.
Sources
-
[1] IFC: AirTrunk Johor project 52336, 13 July 2026
-
[2] MIDA: AirTrunk to build second data centre in Johor, combined cost of two facilities at RM9.7bil, 14 February 2025
-
[3] Developing Telecoms: AirTrunk to develop two new data centres in Malaysia, 30 April 2026
-
[4] DCD: AirTrunk to develop 280MW of data center capacity in Johor, Malaysia, 30 April 2026
-
Digital Halo JHB1
Under construction Digital Halo, Partners Group (majority stake) | Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor
Colocation
- Capacity
- 20 MW IT load, First phase, fully leased to one customer [1] May 2026
- 120 MW Planned build-out, Full campus [1][2] May 2026
- 150 MW Total capacity, TNB power supply agreement [3] September 2025
- Investment
- Not disclosed
- Go-live
- First phase targeted Q4 2026 expected [1][2] May 2026
First phase topped out April 2026.
Sources
-
[1] W.Media: Digital Halo tops out fully leased 20MW data center in Johor, Malaysia, 19 May 2026
-
[2] DCD: Digital Halo tops out Johor data center, Malaysia, 14 May 2026
-
[3] DCD: Digital Halo secures 150MW of power from Malaysian utility TNB for JHB1 data center in Johor, Malaysia, 2 September 2025
-
Bridge Data Centres MY06
Operating Bridge Data Centres | Kidex Sedenak, Sedenak Tech Park, Johor
ColocationHyperscaler, own use
- Capacity
- 110 MW Basis not stated, Overall project, per MIDA in 2022 [1] October 2022, Older figure
- 100 MW IT load, Combined IT load across three buildings, 2021 announcement [2][3] December 2021, Older figure
- Investment
- RM2.5 billion, Over five years, stated in 2021 [3] December 2021, Older figure
- Go-live
- Phase 1 opened 20 October 2022 live [1] October 2022
ByteDance is the tenant named at the phase 1 opening. Newest capacity evidence found is from 2022, so over 2 years old. Current ownership not confirmed.
Sources differ: MIDA gives 110MW and 38 acres. The 2021 announcement gives 100MW IT and about 40 acres.
Sources
-
[1] MIDA: Bridge Data Centres and ByteDance celebrate grand opening of the first phase hyperscale data centre MY06 in Johor, Malaysia, 20 October 2022
-
[2] W.Media: Bridge Data Centres announces construction of 100MW hyperscale data centre campus in Johor, Malaysia, 30 November 2021
-
[3] Bernama: Bernama report on Bridge Data Centres Kidex Sedenak campus (headline not captured), 3 December 2021
-
Open DC PE2
Operating Open DC, EBB Group (Extreme Broadband Sdn Bhd) | Bayan Lepas Technology Park, Phase 4, Bayan Lepas, Penang
Colocation
- Capacity
- 15 MW Total capacity, About 15MW energised, per managing director, September 2026 [1] September 2026
- 10 MW Total capacity, Initial power system [2][3] Page undated, read November 2026
- 30 MW Planned build-out, Earlier scalable target; nearly 80% of this phase committed [2][1] September 2026
- 40 MW Planned build-out, Upgradable power system listed on operator page [3] Page undated, read November 2026
- 100 MW Planned build-out, Full campus target, phased with demand on 10 acres [1][3] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- April 2025 live [2] August 2025
Converted factory on a 10 acre campus, TIA-942 Tier III per operator. No investment figure disclosed.
Sources differ: Current capacity: Tech Wire Asia quotes about 15MW energised but also a September 2026 post saying 10MW live. Upgrade step: 30MW in press, 40MW on the operator page.
Sources
-
[1] Tech Wire Asia: Open DC Penang data centre 100MW Northern Malaysia, 23 September 2026
-
[2] W.Media: Open DC launches Penang's 'largest' data center, 25 August 2025
-
[3] Open DC: PE2 data centre page, Page undated, read November 2026
-
PKNPk and Global Vision Lab AI data centre (proposed)
Planned Global Vision Lab Sdn Bhd | Perak, site not named, Perak
AI or GPU focused
- Capacity
- 100 MW Planned build-out, Above 100MW, planning target not finalised [1][2] November 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
NDA and letter of consent only. ITMAN Service Center and Future Quantum named as partners with roles not finalised. Site assessments pending.
Sources
-
[1] The Star: PKNPk, Global Vision Lab explore AI data centre development in Perak, 3 November 2026
-
[2] The Edge Malaysia: PKNPk and Global Vision Lab AI data centre, 3 November 2026
-
Victoria Data Centre Jasin AI data centre
Announced Victoria Data Centre | Jasin, Melaka
AI or GPU focused
- Capacity
- 96 MW IT load, Three buildings, up to 96MW; IT basis stated by RTM only [1][2][3] February 2026
- 100 MW Basis not stated, About 100MW, per Chief Minister [1][2] February 2026
- Investment
- RM9 billion, More than RM9 billion [1][2][3] February 2026
- Go-live
- Not disclosed
Chief Minister announced in February 2026; RTM said a MITI decision was pending. No later approval or construction report found.
Sources differ: Chief Minister said about 100MW; the same reports give up to 96MW across three buildings. RTM spells the investor Vitoria, others Victoria.
Sources
-
[1] Bernama: Melaka to get over RM9 billion investment to build AI data centre in Jasin, 4 February 2026
-
[2] Malay Mail: Melaka to receive RM9b Hong Kong investment for state's first AI data centre, says CM, 5 February 2026
-
[3] RTM: Melaka bakal terima pelaburan RM9 bilion, pusat data AI pertama di Jasin, 4 February 2026
-
Bridge Data Centres MY01 and MY02
Operating Bridge Data Centres, Bridge Data Centres | Cyberjaya, Selangor
Colocation
- Capacity
- 98 MW IT load, MY01 and MY02 total IT capacity, 5 buildings, per undated operator page; may include planned phases [1] Page undated, read November 2026
- 87 MW Planned build-out, IT capacity added by three phase expansion on new Cyberview land, MY02 [2][3] February 2024, Older figure
- 20 MW IT load, Critical IT load at acquisition in 2018, with a further 20MW planned [4] May 2018, Older figure
- Investment
- Not disclosed
- Go-live
- Not disclosed
Former CSF Group sites: Bridge bought CSF's operating business in 2017 and two Cyberjaya sites from PNB in 2018. Expansion timing is not published.
Sources
-
[1] Bridge Data Centres: Malaysia locations, Page undated, read November 2026
-
[2] MIDA: Bridge Data to build its largest data centre in Malaysia, 29 February 2024
-
[3] w.media: Bridge Data Centres Expands Footprint with Third Hyperscale Data Centre in Cyberjaya, Malaysia, 29 February 2024
-
[4] PR Newswire: Bridge Data Centres expands APAC footprint with acquisition of data centres in Malaysia, 9 May 2018
-
BrightRay Sedenak campus
Operating BrightRay | Sedenak Tech Park, Johor
Colocation
- Capacity
- 90 MW Planned build-out, Three data centres when fully built [1] May 2025
- Investment
- Not disclosed
- Go-live
- MY-01 launched May 2025 live [1] May 2025
MY-01 is the first of three planned facilities and its own MW is not stated.
Sources differ: W.Media says BrightRay is based in China. Datacentermap, a directory, says Singapore.
Sources
-
[1] W.Media: BRIGHTRAY breaks record by completing data center in 8 months, 28 May 2025
-
Racks Central RCJM 1
Under construction Racks Central | Iskandar Halal Park, Johor
Colocation
- Capacity
- 90 MW Basis not stated, Targeted by end of 2026 [1] December 2025
- Investment
- Not disclosed
- Go-live
- End of 2026 target expected [1] December 2025
Groundbreaking December 2025 on a five acre plot bought in October 2024.
Sources
-
[1] DCD: Singapore's Racks Central breaks ground on data center in Johor, Malaysia, 11 December 2025
-
[2] EdgeProp: Johor approved 42 data centre construction projects in 2Q2025, exco, 28 October 2025
-
Bitdeer AI Cyberjaya campus
Operating Bitdeer AI, Bitdeer Technologies | Cyberjaya, Selangor
AI or GPU focused
- Capacity
- 2 MW Basis not stated, Operating as of 31 July 2026 [1] August 2026
- 9.5 MW Basis not stated, A102, being built for GB300 NVL72 systems [1] August 2026
- 60 MW Basis not stated, A103, eight year data centre services agreement [2][3] October 2026
- 71.5 MW Planned build-out, A101, A102 and A103 together [2] October 2026
- Investment
- Not disclosed
- Go-live
- A103 energisation expected Q1 2028 expected [2][3] October 2026
A102 revenue expected from Q1 2027. A102 appears to be the 9.5MW Cyberjaya capacity reported by TheEnergyMag.
Sources differ: TheEnergyMag gives 2MW operating at 31 July 2026.
Sources
-
[1] TheEnergyMag: Bitdeer Secures $400M Malaysia AI Contract, Targets 350 MW by 2028, 20 August 2026
-
[2] w.media: Bitdeer adds 127MW in Malaysia as AI cloud expansion gathers pace, 14 October 2026
-
[3] TechNode Global: Singapore-based Bitdeer AI adds 60MW Malaysia facility, lifting secured AI capacity to 333.5MW, 13 October 2026
-
EdgeConneX Bukit Jalil
Under construction EdgeConneX, EdgeConneX | MRANTI Park, Bukit Jalil, Kuala Lumpur
Colocation
- Capacity
- 70 MW Planned build-out, Source says nearly 70MW IT load [1] September 2023, Older figure
- Investment
- Not disclosed
- Go-live
- Not disclosed
EdgeConneX said in June 2025 that this site was under construction. No newer status has been published.
Sources
-
[1] TelecomTalk: EdgeConneX Enters Malaysia With Plans to Build Nearly 300 MWs of Data Center Capacity, 12 September 2023
-
[2] EdgeConneX: Cyberjaya scales as a regional data center hub, 25 June 2025
-
MRCB Bukit Jalil AI-ready data centre
Announced Perintis Akal (PEMANDU Partners unit), with Inspur Communication Malaysia on construction and operations, Bukit Jalil Sentral Property (MRCB) | Bukit Jalil, Kuala Lumpur
AI or GPU focused
- Capacity
- 65 MW Planned build-out, IT load [1] June 2026
- 65 MW IT load, Planned IT load [2][1] June 2026
- Investment
- RM2.1 billion, Gross development cost RM2.1 billion [1][2] June 2026
- Go-live
- Construction expected to finish by Q4 2027 expected [1] June 2026
Collaboration agreement only; definitive agreements were due by Q3 2026 and no signing was confirmed. Inspur Communication Malaysia is build and operations partner. Collaboration agreement signed; definitive agreements were due by Q3 2026. Long-term tenant under 10 year lease.
Sources
-
[1] w.media: MRCB enters data center market with 65 MW project in Bukit Jalil, Malaysia, 25 June 2026
-
[2] EdgeProp: MRCB unit signs collaboration agreement for RM2.1 bil AI-ready data centre facility in Bukit Jalil, 18 June 2026
-
NEXTDC KL1
Operating NEXTDC | Petaling Jaya, Selangor
Colocation
- Capacity
- 65 MW IT load, Design IT capacity [4][5] November 2026
- Investment
- A$1 billion [4] May 2026
- Go-live
- 14 May 2026 live [4] May 2026
Launched in May 2026. NEXTDC says it is set to become the first Uptime Institute Tier IV certified data centre in Peninsular Malaysia. Mitrajaya is still working on later stages, with main works at RM844.66 million.
Sources
-
[1] The Star: Mitrajaya accepts RM42.81mil fourth variation order for data centre project, 20 January 2026
-
[2] The Star: Mitrajaya's KL data centre contract value more than doubles to RM801.8mil, 30 September 2025
-
[3] EdgeProp: Mitrajaya bags another data centre job from NEXTDC, 21 April 2026
-
[4] NEXTDC: NEXTDC goes live with KL1 Kuala Lumpur, 14 May 2026
-
[5] AI News Malaysia: Inside NEXTDC KL1, the first Tier IV certified data centre in Peninsular Malaysia, 7 November 2026
-
SIC Quantum Data Centre
Announced SIC Quantum Data Centre Sdn Bhd, Joint venture of Selangor Industrial Corporation (PKNS unit) and Data Centre Union | Cyberjaya, Selangor
AI or GPU focused
- Capacity
- 65 MW Planned build-out, Planned capacity [1] June 2026
- Investment
- RM2.5 billion, Estimated RM2.5 billion, also reported as US$600 million [1][2] June 2026
- Go-live
- Not disclosed
Announced June 2026 after SIC ended a previous project with Silver Ridge in August 2025.
Sources
-
[1] EdgeProp: PKNS unit SIC secures new partner to develop RM2.5 bil data centre in Cyberjaya, 24 June 2026
-
[2] w.media: SIC and DC Union to build US$ 600 million data center in Cyberjaya, June 2026
-
Bridge Data Centres MY03
Under construction Bridge Data Centres, Bridge Data Centres | MRANTI Park, Bukit Jalil, Kuala Lumpur
Colocation
- Capacity
- 16 MW IT load, Original facility as announced in 2021 [1] February 2021, Older figure
- 64 MW Planned build-out, IT capacity after announced 48MW expansion [2] June 2023, Older figure
- 48 MW IT load, Operator page figure, 4 buildings [3] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- Originally Q2 2022; 2023 plan gives phase one Q3 2025 and phase two Q4 2027 expected [1][2] June 2023
Directories list two buildings as operating, but no primary source read confirms this, so status stays construction.
Sources differ: 2023 announcement gives 64MW IT in total. Bridge's current page shows 48MW and 4 buildings. Unclear whether 48MW is the expansion only or the full site.
Sources
-
[1] Capacity: Bridge Data Centres to build 16MW data centre in Malaysia, 2 February 2021
-
[2] w.media: Data Centre in Kuala Lumpur will accelerate digital transformation in Malaysia and Asia Pacific, 26 June 2023
-
[3] Bridge Data Centres: Malaysia locations, Page undated, read November 2026
-
Pi Data Centre Cyberjaya
Announced Pi Data Centre, PiDC Holding (60 percent) and Jakel Group (40 percent) | Cyberjaya, 7.3 acre site, Selangor
Colocation
- Capacity
- 51 MW Planned build-out, Tier III data centre, three phases [1] June 2024, Older figure
- Investment
- RM1.2 billion, Reported as RM1.2 billion [1] June 2024, Older figure
- Go-live
- Phase one targeted to finish Q4 2025 expected [1] June 2024
Phase one construction was due to start Q3 2024. Newest evidence is June 2024; no source read confirms building began. Source does not state customer type.
Sources
-
[1] MIDA (from The Edge Malaysia): Jakel invests in data centre project worth RM1.2 bil, 1 June 2024
-
AIMS Cyberjaya (CJ1)
Operating AIMS Data Centre, Time dotCom and DigitalBridge funds (49 percent stake sold to DigitalBridge in 2022 deal) | Cyberjaya, Selangor
Colocation
- Capacity
- 50 MW Planned build-out, Flagship campus, up to 50MW IT load as reported in 2022 [1] November 2022, Older figure
- 8 MW IT load, Block 2 [2] July 2024, Older figure
- 12 MW IT load, Block 3 total IT load as reported in July 2024, before completion [2] July 2024, Older figure
- Investment
- Not disclosed
- Go-live
- First phase began operations late 2021; Block 3 completed July 2025 live [1][3] July 2025
AIMS says total potential capacity exceeds 100MW across the Klang Valley after Block 3, a figure that also covers its Kuala Lumpur sites. Block 1 MW is not published.
Sources
-
[1] Mingtiandi: DigitalBridge buys into Malaysia's AIMS Data Centre, 23 November 2022
-
[2] BTW Media: AIMS Cyberjaya Block 2 now operational, 12 July 2024
-
[3] w.media: AIMS Data Centre completes Cyberjaya Block 3 ahead of schedule, 28 July 2025
-
[4] Malaysiakini (company announcement): AIMS Cyberjaya Block 3 announcement, 24 July 2025
-
Privasia Bagan Datuk data centre
Under construction Silver Streams Technofarm Sdn Bhd (Privasia Technology Bhd), Privasia Technology Bhd | Bagan Datuk, Perak
Colocation
- Capacity
- 10.06 MW IT load, Phase 1 [1][2] April 2026
- 35 MW Planned build-out, Full facility, remaining 25MW subject to demand [3] April 2026
- 50 MW Total capacity, Maximum off-grid power demand set in MITI approval [4] October 2026
- Investment
- Not disclosed
- Go-live
- End 2027 or early 2028 (Phase 1); full rollout 2028 expected [2][3] April 2026
MITI approved on 7 September 2026, subject to conditions. Land leased from Felcra for 30 years. MARA Inc dropped as JV partner but supports. Early works under way. EPCC contract value for phase 1; Phase 2 cost not set: RM569 million.
Sources differ: The Sun describes RM569 million as the project value; The Star says it is the EPCC contract, with total project investment not stated.
Sources
-
[1] The Star: Privasia kicks off RM569mil Perak DC job, 3 December 2025
-
[2] The Star: Bagan Datuk positioned as data centre hub with RM569mil data centre project - Privasia, 10 April 2026
-
[3] The Sun via Newswav: Privasia scales up Perak data centre to 35MW, 13 April 2026
-
[4] The Star: Privasia unit gets Miti nod for DC project, 6 October 2026
-
[5] EdgeProp: Privasia to develop Bagan Datuk data centre on its own, MARA to provide support, 13 November 2025
-
Digital Realty Cyberjaya campus
Operating Digital Realty, Digital Realty | Cyberjaya, Selangor
ColocationAI or GPU focused
- Capacity
- 1.5 MW IT load, KUL10, former TelcoHub 1; to nearly double by Q4 2027 [1][2] June 2026
- 15 MW IT load, KUL11, AI and HPC facility about 500m from KUL10 [1][2] June 2026
- 14 MW Planned build-out, Third facility on 1.6 acre parcel [1][2] June 2026
- 32 MW Planned build-out, Whole campus, reported as around 32MW [1] June 2026
- Investment
- Not disclosed
- Go-live
- KUL10 upgrade by Q4 2027; third facility targeted for mid 2028 expected [1] June 2026
Two facilities described as operational. KUL10 came through the purchase of CSF Advisers.
Sources
-
[1] DataCenterNews Asia Pacific: Digital Realty expands Malaysia footprint with Cyberjaya hub, 8 June 2026
-
[2] w.media: Digital Realty debuts in Malaysia with 3-facility campus in Cyberjaya, 8 June 2026
-
[3] Tech Wire Asia: Digital Realty Malaysia Cyberjaya launch, 8 June 2026
-
NexQuantum AI Digital Park
Announced NexQuantum 1 Sdn Bhd, Cahya Suria Services Sdn Bhd and Suzhou EnnoTHING Technology Co Ltd | Silver Valley Technology Park, near Ipoh, Perak
AI or GPU focused
- Capacity
- 32 MW Basis not stated, NQ1 flagship, Tier III with liquid cooling; no MW given for NQ2 to NQ8 [1][2][3] September 2026
- Investment
- RM1 billion, NQ1 only, estimated [1][2] May 2026
- RM8 billion, Whole AI Digital Park as reported by EdgeProp; may include the RM1 billion NQ1 [3] September 2026
- Go-live
- NQ1 about 14 months after a 2026 construction start expected [3] September 2026
Eight facilities planned, NQ1 to NQ8. No evidence yet that construction has begun. EdgeProp said construction starts in 2026.
Sources differ: EdgeProp gives both 148 acres (eight data centres) and 140 acres (RM8 billion park) and names Suzhou Huahan Technology as partner, while Bernama, NST and W.Media name Suzhou EnnoTHING. Ipoh Echo says development is subject to planning, technical, utility and regulatory requirements.
Sources
-
[1] NST: RM1bil NexQuantum AI park launched in Perak, 15 May 2026
-
[2] W.Media: Malaysia and China firms mull US$250 million investment in 32MW AI data center in Perak, Malaysia, 15 May 2026
-
[3] EdgeProp: SVTP plants flag on Perak's high tech industrial ambition, 21 September 2026
-
[4] Ipoh Echo: NexQuantum AI Digital Park, 22 May 2026
-
NTT Cyberjaya campus
Operating NTT DATA, NTT | Cyberjaya, Selangor
Colocation
- Capacity
- 7 MW IT load, CBJ6 critical IT load [1][2] Page undated, read November 2026
- 22 MW Total capacity, CBJ5 and CBJ6 combined facility load [1] October 2023, Older figure
- Investment
- RM234 million, CBJ6 only, over RM234 million, also reported as US$50 million [1] October 2023, Older figure
- Go-live
- CBJ5 built 2021; CBJ6 launched October 2023 live [1] October 2023
NTT's page lists CBJ4, CBJ5 and CBJ6, and its map caption also names CBJ1 and CBJ3. MW for CBJ1, CBJ3 and CBJ4 is not published.
Sources
-
[1] MIDA: NTT strengthens commitment to Malaysia with the launch of Cyberjaya 6 (CBJ6) data center, 10 October 2023
-
[2] NTT DATA: Cyberjaya 5 Data Center, Page undated, read November 2026
-
[3] NTT DATA: Cyberjaya data centers, Page undated, read November 2026
-
GDC-SDK1
Under construction Global Data Centre Sdn Bhd | Sedenak Tech Park, Johor
ColocationAI or GPU focused
- Capacity
- 21 MW Basis not stated, AI data centre, up to 1,000 racks [1] November 2025
- Investment
- Not disclosed
- Go-live
- Power expected ready by Q2 2026 expected [1] November 2025
Broke ground November 2025 on 3.166 acres. No later update found on whether power or service has started. Colocation type is not explicit in the source.
Sources
-
[1] W.Media: GDC breaks ground at its Johor AI data center site, 11 November 2025
-
Open DC D8-1
Operating Open DC, EBB Group (Extreme Broadband Sdn Bhd), developed with Northern Gateway | Delapan Special Border Economic Zone, Bukit Kayu Hitam, Kedah
ColocationTelco
- Capacity
- 2 MW Basis not stated, Current capacity, near full, September 2026 [1] September 2026
- 4 MW Planned build-out, Expansion under way, second block also planned [1] September 2026
- 5 MW Total capacity, Initial 11kV power system on operator page [2] Page undated, read November 2026
- 20 MW Planned build-out, Upgradable 33kV power system on operator page [2] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Border peering hub, TIA-942 Rated III per operator. DE-CIX node full launch targeted end 2026 or January 2027.
Sources differ: Tech Wire Asia says 2MW now rising to 4MW; the operator page lists a 5MW initial power system upgradable to 20MW. The two may describe IT load and power supply, but neither says so.
Sources
-
[1] Tech Wire Asia: Open DC Penang data centre 100MW Northern Malaysia, 23 September 2026
-
[2] Open DC: D8-1 data centre page, Page undated, read November 2026
-
EdgeConneX Kuala Lumpur CBD
Under construction EdgeConneX, EdgeConneX | Kuala Lumpur Central Business District, Kuala Lumpur
Colocation
- Capacity
- 19 MW Planned build-out, IT load as announced in 2023 [1] September 2023, Older figure
- Investment
- Not disclosed
- Go-live
- Not disclosed
EdgeConneX said in June 2025 that its downtown Kuala Lumpur facility was under construction. No newer status has been published.
Sources
-
[1] TelecomTalk: EdgeConneX Enters Malaysia With Plans to Build Nearly 300 MWs of Data Center Capacity, 12 September 2023
-
[2] EdgeConneX: Cyberjaya scales as a regional data center hub, 25 June 2025
-
Vantage KUL1
Operating Vantage Data Centers, Vantage Data Centers | Cyberjaya, Selangor
Colocation
- Capacity
- 16 MW Basis not stated, Fourth facility KUL14 only, fully leased to one tenant [1] December 2025
- Investment
- Not disclosed
- Go-live
- Campus completed with KUL14 online in December 2025 live [1] December 2025
No source read states KUL1's total MW directly. KUL1 and KUL2 together were given as 287MW IT in 2023.
Sources differ: IREI calls KUL1 a 16MW campus, but that figure matches the new fourth facility. Vantage said in 2023 that KUL1 and KUL2 together total 287MW IT.
Sources
-
[1] w.media: Vantage Data Centers completes Cyberjaya campus with launch of fully leased 16MW fourth facility, 5 December 2025
-
[2] IREI: Vantage Data Centers unveils 16MW data center facility in Malaysia, 5 December 2025
-
[3] Free Malaysia Today: Vantage Data Centers to open RM13.3bil data centre campus in Cyberjaya, 16 May 2023
-
Basis Bay and STT GDC Cyberjaya campus
Operating Basis Bay and ST Telemedia Global Data Centres joint venture, Basis Bay and ST Telemedia Global Data Centres | Cyberjaya, Selangor
Colocation
- Capacity
- 14 MW Planned build-out, STT Kuala Lumpur 1, up to 14MW IT load upon completion [1] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- Cyberjaya DC.2 opened November 2025 live [2] November 2025
Cyberjaya DC.2 is live; its MW is not disclosed. STT Kuala Lumpur 1 is described as still to complete.
Sources differ: A 2023 report placed STT Kuala Lumpur 1 in Kuala Lumpur. STT's factsheet places it within Cyberjaya alongside Cyberjaya DC.2, which is used here.
Sources
-
[1] ST Telemedia GDC: STT Kuala Lumpur 1 factsheet, Page undated, read November 2026
-
[2] EdgeProp: Basis Bay opens world's first eco-green data centre, 10 November 2025
-
[3] w.media: STT GDC and Basis Bay Forge Partnership to Build Data Centers in Kuala Lumpur and Cyberjaya, 3 November 2023
-
Infinaxis Cyberjaya
Under construction Infinaxis Data Centre Platform, Joint venture formed by a Gaw Capital Partners fund and partners | Cyberjaya, Selangor
Colocation
- Capacity
- 12 MW IT load, First plot; second plot could double IT capacity [1][2] June 2024, Older figure
- Investment
- Not disclosed
- Go-live
- Ready for service targeted Q2 2025 expected [1][2] June 2024
Groundbreaking October 2023. A directory lists phase one as live from mid 2025, which no primary source confirms.
Sources
-
[1] TechNode Global: Infinaxis Data Centre Platform breaks ground on its inaugural data center in Cyberjaya, 26 October 2023
-
[2] BTW Media: Velo, Infinaxis boost Cyberjaya data centre capacity, 17 June 2024
-
Jalan Sri Permaisuri data centre, Cheras
Under construction Not disclosed, Exsim Sri Permai Sdn Bhd | Jalan Sri Permaisuri, Cheras, Kuala Lumpur
Colocation
- Capacity
- 10 to 20 MW Basis not stated, Estimated, per RHB as reported by NST [1] July 2026
- Investment
- Not disclosed
- Go-live
- Phase 1 within 20 months of 19 Feb 2026; Phase 2 within 18 months of 1 Jul 2026 expected [2][3] July 2026
Binastra contracts: Phase 1 RM503m (EdgeProp), Phase 2 RM491.2m (NST). Client is Exsim Sri Permai.
Sources
-
[1] New Straits Times: RHB flags strong visibility for Binastra on data centre expansion, 2 July 2026
-
[2] EdgeProp: Binastra bags RM503 mil data centre job in KL, 4 February 2026
-
[3] New Straits Times: Binastra bags RM491.2mil contract to build Cheras data centre, 1 July 2026
-
[4] w.media: Firm bags US$240 million deal for construction of Phases 1 & 2 Kuala Lumpur DC, 13 July 2026
-
Menara AIMS
Operating AIMS Data Centre, Time dotCom and DigitalBridge funds | Changkat Raja Chulan, Kuala Lumpur
Colocation
- Capacity
- 10 MW Basis not stated, Reported in 2022 as the downtown KL facility [1] November 2022, Older figure
- Investment
- Not disclosed
- Go-live
- Not disclosed
Newest capacity evidence dates from 2022. Exabytes lists a facility on Level 7 of Menara AIMS, confirming continued use.
Sources
-
[1] Mingtiandi: DigitalBridge buys into Malaysia's AIMS Data Centre, 23 November 2022
-
[2] Exabytes: Malaysia Data Center, Page undated, read November 2026
-
Open DC PE1
Operating Open DC, EBB Group (Extreme Broadband Sdn Bhd) | Menara Suntech, Penang Cybercity, Bayan Baru, Penang
Colocation
- Capacity
- 0.3 MW Total capacity, Operator lists 300 kW power capacity in 1,000 sq ft [1] Page undated, read November 2026
- Investment
- Not disclosed
- Go-live
- Not disclosed
Operator page describes current tenants and the Penang Internet Exchange hosted there, but gives no live date. Page is undated.
Sources
-
[1] Open DC: PE1 data centre page, Page undated, read November 2026
-
[2] Tech Wire Asia: Open DC Penang data centre 100MW Northern Malaysia, 23 September 2026
-
AIMS Cyberjaya data centre (MYT DC3)
Under construction AIMS Data Centre, DigitalBridge Group | Cyberjaya, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Phased completion 15 June to 15 December, year not stated in source expected [1] February 2025
Binastra RM250.37m contract for six-storey building, awarded by MYT DC3 Sdn Bhd (EdgeProp). Construction start was set for 26 February.
Sources
-
[1] EdgeProp: Binastra bags RM250m job to build data centre in Cyberjaya, 12 February 2025
-
Amazon data centre, Persiaran APEC
Planned Amazon Web Services, Amazon | Persiaran APEC, Cyberjaya, Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Newest evidence is August 2024, over 2 years old. Multi-phase project; construction dates were blank in the notice reported. MW not disclosed.
Sources
-
[1] Lowyat.NET: Amazon data centre in Malaysia taking shape, 19 August 2024
-
Amazon Sepang land (Sunsuria City)
Planned Amazon Data Services Malaysia, Amazon Data Services Malaysia (purchase pending) | Sepang, Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Land sale of RM316.84 million for about 183,973 square metres, subject to approvals, completing Q2 2027. Price is not project investment.
Sources
-
[1] w.media: Amazon buys 2 million sq ft land in Selangor, Malaysia to build data center, 29 September 2026
-
AREA Group Delapan data centre campus
Under construction Data Gateway Sdn Bhd (AREA Group of Companies), AREA Group of Companies | Delapan Special Border Economic Zone, near Bukit Kayu Hitam, Kedah
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- First data centre targeted by end 2025 expected [1] October 2024
Newest company evidence is October 2024, over 2 years old. Whether the end 2025 target was met is not confirmed. No MW published. Gross development value of phase one (30 acres): US$2.4 billion. Gross development value of full 156 acre campus, not capital spending: US$15 billion.
Sources differ: GlobalData via World Construction Network lists a 63.13 hectare Delapan data centre park with construction from Q4 2024 and completion in Q4 2027, which may be this project. It names no operator.
Sources
-
[1] EdgeProp: AREA acquires 30 acre land in Delapan, Kedah to build data centre, 11 October 2024
-
[2] World Construction Network: Delapan SBEZ Data Center Park, Kedah, 23 January 2025
-
Basis Bay Cyberjaya DC.1
Operating Basis Bay, Basis Bay Services MSC (agreed purchase from Keppel DC REIT, January 2025) | Cyberjaya, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Completed 2009 live [1] Page undated, read November 2026
MW not disclosed. Keppel DC REIT agreed to sell for RM55.6 million; completion of the sale not confirmed by a source read.
Sources
-
[1] Keppel DC REIT: Basis Bay Data Centre, Page undated, read November 2026
-
[2] EdgeProp: Keppel DC REIT divests Basis Bay Data Centre in Cyberjaya at 2.6% above valuation, 3 January 2025
-
Bridge Data Centres Banting campus
Announced Bridge Data Centres, Bridge Data Centres Malaysia VII Sdn Bhd (land buyer) | IOI Industrial Park @ Banting, Kuala Langat, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
IOI Properties land sale, RM740.7m, 136.03 acres (Mingtiandi). Sale agreement for 136.03 acres at RM740.68m signed 29 January 2026 with IOI Properties unit. Site MW and timeline not disclosed.
Sources
-
[1] IOI Properties (The Malaysian Reserve): IOI Properties sells Banting industrial land to Bridge Data Centres for RM741m, 4 February 2026
-
[2] Mingtiandi: Bain-backed Bridge Data Centres buying Malaysia land for $188M, 5 February 2026
-
Bridge Data Centres Plentong site
Planned Bridge Data Centres | Plentong, Johor Bahru, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Paragon Globe land sales: 47.86 acres RM238.32m, 19.759 acres RM98.98m (The Edge). Newest evidence from August 2024, over two years old.
Sources
-
[1] The Edge Malaysia: Paragon Globe sells more of Johor land it bought last year to data centre company for RM98.98m, 2 August 2024
-
Data Cloud Innovation site, Nusa Cemerlang Industrial Park
Planned Data Cloud Innovation (Magma Holding) | Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Crescendo land sale, RM120.06m, five plots (EdgeProp, December 2024).
Sources
-
[1] EdgeProp: Crescendo seals seventh land sale in Johor, to data centre operator, 9 December 2024
-
DayOne Iskandar Puteri site (Paragon Globe land)
Announced DayOne | Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Paragon Globe land sale, RM398.11m, 65 acres, shareholders approved, completion due 2H 2027 (w.media).
Sources
-
[1] w.media: DayOne's Johor US$100 million land purchase gets seller's shareholders nod, 28 October 2026
-
DayOne Kempas Tech Park (KTP) campus
Operating DayOne | Kempas Tech Park, Johor Bahru, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Part of the programme: DayOne cumulative Malaysia investment
- Go-live
- Not disclosed
Land acquired 2023. F-1 counts it in capacity in service, so at least part is live. Combined NTP and Kempas MW are in the NTP entry.
Sources differ: MW per campus is not published. DayOne's F-1 says KTP was 34.3% of group capacity in service at 20 September 2026.
Sources
-
[1] US SEC: DayOne Data Centers Form F-1 registration statement, 5 October 2026
-
[2] DayOne: Our markets: Johor, Page undated, read November 2026
-
DayOne Nusajaya Tech Park (NTP) campus
Operating DayOne | Nusajaya Tech Park, Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Part of the programme: DayOne cumulative Malaysia investment
- Go-live
- 2023 live [1][2] Page undated, read November 2026
First DayOne campus, delivered 2023. Figures published only for NTP and Kempas together, so capacity is left empty here.
Sources differ: No per campus MW found. DayOne's Johor page gives both 390MW in service and over 478MW operational across NTP and Kempas combined. W.Media says around 500MW combined. The F-1 says NTP was 47.8% of group capacity in service at 20 Sep 2026.
Sources
-
[1] US SEC: DayOne Data Centers Form F-1 registration statement, 5 October 2026
-
[2] DayOne: Our markets: Johor, Page undated, read November 2026
-
[3] W.Media: DayOne deepens Johor data center push with US$ 96.6 million land deal, 26 June 2026
-
DayOne Southville City site
Announced DayOne, DayOne (purchase pending) | Southville City, Sepang, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Mah Sing conditional land sale, RM617.86m, 78.8 acres, completion due 2H 2027 (Bernama). Buyer associates interested in Nvidia GPU computing (The Star). 78.80 acres from Mah Sing for RM617.8 million; completion expected 2H 2027, subject to task force approval. Price is not project investment.
Sources differ: w.media ties buyer WG Malaysia X to DayOne. The Edge and The Star say only an international digital infrastructure group.
Sources
-
[1] w.media: DayOne buys US$ 152.8 million Sepang land in Malaysia to build data center, 20 August 2026
-
[2] Bernama: Mah Sing Unit To Dispose Of Dengkil Land For RM618 Mln, 20 August 2026
-
[3] The Edge Malaysia: Mah Sing to sell Sepang land to data centre developer for RM617.9m cash, 20 August 2026
-
[4] The Star: Mah Sing unlocks RM617.9mil from digital infrastructure land, accelerating next phase of growth, 20 August 2026
-
DayOne Tanjung Kupang land parcel
Planned DayOne | Mukim of Tanjung Kupang, Johor Bahru district, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Conditional sale of 26.42 ha from Paragon Globe, signed June 2026. Land zoned agricultural. DayOne buyer entity later substituted. No campus plan published. Land price only, in eight tranches tied to milestones: RM398.11 million.
Sources differ: EdgeProp and W.Media give completion of the land sale as second half 2027.
Sources
-
[1] EdgeProp: Paragon Globe signs RM398.1 mil conditional SPA to dispose of Johor land, 24 June 2026
-
[2] W.Media: DayOne deepens Johor data center push with US$ 96.6 million land deal, 26 June 2026
-
[3] EdgeProp: Daily digest, 29 September 2026, 29 September 2026
-
Digital Edge Kota Tinggi site
Planned Digital Edge | Kota Tinggi, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Sale agreed April 2026, due to complete in second half 2027. Digital Edge's first Malaysian site. MW not published. Crescendo conditional land sale, RM346.53m, 49.72 acres (The Edge). Needs data centre task force approval and TNB power clearance. Sources do not state a build plan. Land price only, 49.72 acres from Crescendo: RM346.53 million.
Sources
-
[1] The Edge Malaysia: Crescendo Corp sells Johor land to data centre developer for RM346.5 mil, 9 April 2026
-
[2] The Star: Crescendo disposes of Johor land for RM347mil, 9 April 2026
-
[3] W.Media: Digital Edge enters Malaysia with 50-acre Johor land purchase, 17 April 2026
-
[4] DCD: Digital Edge acquires 50 acres of land in Johor, Malaysia for data center, April 2026
-
Digital Hyperspace i-TechValley site
Planned Digital Hyperspace Malaysia Sdn Bhd | i-TechValley, Pulai, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
AME Elite land sale, RM209.84m, 34.91 acres (EdgeProp). Sale completed August 2025.
Sources
-
[1] EdgeProp: AME Elite shares rise to new record high on Pulai land sale, 14 May 2024
-
[2] EdgeProp: AME Elite posts record 2Q net profit on land sale, declares total six sen dividend, 28 November 2025
-
East Coast High-Performance Computing Data Centre
Planned UMT Holdings, Universiti Malaysia Terengganu, through UMT Holdings | UMT Bukit Kor Campus, Marang, Terengganu
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
MoU between UMT Holdings and MIMOS. Page is undated, tagged 2024 issue 3, so evidence may be over 2 years old. No later update found.
Sources
-
[1] MIMOS: East Coast High-Performance Computing Data Centre MoU, Page undated, read November 2026
-
East Ledang data centre plot
Planned Not disclosed | East Ledang, Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
UEM Sunrise land sale, RM144.9m, 28.9 acres, to unnamed global data centre player (The Edge). Newest evidence from June 2024, over two years old.
Sources
-
[1] The Edge Malaysia: UEM Sunrise to sell Johor land for RM144.9m to data centre company, 11 June 2024
-
Equalbase Sunway City Iskandar Puteri campus
Announced Equalbase | Sunway City Iskandar Puteri, Johor
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Land purchase for a planned campus: more than RM380 million for two parcels totalling 64 acres from Sunway (The Star). Newest evidence is from July 2024, over two years old.
Sources
-
[1] DCD: Malaysia's Equalbase buys land in Johor for data center development, 2 July 2024
-
[2] The Star: Sunway City Iskandar Puteri seals RM380mil land deal for data centres, 2 July 2024
-
Equinix JH1
Operating Equinix, Equinix | Nusajaya Tech Park, Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- US$40 million, Initial outlay [1] May 2024, Older figure
- Go-live
- Officially opened May 2024 live [1] May 2024
Up to 500 cabinets and 1,800 sqm of colocation space. MW not published by Equinix.
Sources
-
[1] Equinix: Equinix's Dual Metro Data Centers Propel Malaysia's Digital Economy Ambition to New Heights, 27 May 2024
-
Equinix KL1
Operating Equinix, Equinix | Cyberjaya, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- US$100 million, Reported as US$100 million, also RM470.6 million [1][2] May 2026, part of a wider programme, not added to the site total
- Part of the programme: Equinix Malaysia cumulative investment
- Go-live
- Reported open by June 2024; phase 2 completed May 2025 live [1][3] May 2025
MW not disclosed. Full build is 900 cabinets and 2,630 square metres of colocation space.
Sources
-
[1] Digital News Asia: Equinix opens two data centers in Malaysia with US$140 mil invested to date, 1 June 2024
-
[2] EdgeProp: Equinix to build fourth Malaysia data centre in Cyberjaya for US$190m, 13 May 2026
-
[3] w.media: Equinix completes Phase 2 of KL1 IBX data center, 7 May 2025
-
Equinix KL2
Announced Equinix, Equinix | Cyberjaya, less than 1km from KL1, Selangor
ColocationAI or GPU focused
- Capacity
- Not disclosed
- Investment
- US$190 million, Over US$190 million, also reported as about RM747 million [1][2] May 2026, part of a wider programme, not added to the site total
- Part of the programme: Equinix Malaysia cumulative investment
- Go-live
- Not disclosed
MW not disclosed. Over 2,200 cabinets at full build-out. Plot of 14,300 square metres bought from Cyberview in July 2024 for RM23 million.
Sources
-
[1] Equinix: Equinix to Develop Purpose-Built IBX Data Center in Kuala Lumpur to Support Malaysia's AI and Cloud Growth, 11 May 2026
-
[2] EdgeProp: Equinix to build fourth Malaysia data centre in Cyberjaya for US$190m, 13 May 2026
-
Exabytes Penang Tier 3 data centre (proposed)
Planned Exabytes | Likely Bayan Lepas Free Industrial Zone, Penang
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
State government pledged support in January 2025 with talks ongoing. No later update found.
Sources
-
[1] Buletin Mutiara: Penang govt backs Exabytes in establishing tier-3 data centre, 6 January 2025
-
Google Elmina data centre and Google Cloud region
Operating Google, Pearl Computing Malaysia (lessee), Sime Darby Property (land) | Elmina Business Park, Sungai Buloh, Shah Alam, Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- US$2 billion, May 2024 pledge for the first Malaysian data centre and Google Cloud region at Elmina [1] November 2026
- Go-live
- Operations started 19 October 2026 (first facility); adjacent 77 acre facility targeted for 2027 live [1][2] November 2026
First facility went live in October 2026. Sime Darby Property leases 49 and 77 acre sites to Google unit Pearl Computing, for up to RM2 billion and RM5.6 billion over 20 years. IJM won core and fit-out contracts. Google states no capacity. Not stated to be inside the US$15 billion announced in November 2026.
Sources differ: Completion targets for the 77 acre facility vary by contract, between Q2 and Q3 2027.
Sources
-
[1] Media Selangor: Anwar remarks at Google announcement, Elmina operations, 4 November 2026
-
[2] Sime Darby Property: Sime Darby Property to Develop Additional Data Centres at Elmina Business Park, 2 December 2024
-
[3] SoyaCincau: Google Elmina data centre is now live: Puncak Alam, Serendah, Port Dickson in the works, 4 November 2026
-
[4] The Star: Sime Darby Property to develop data centre, RM2bil lease value for first 20 years, 23 May 2024
-
[5] MIDA: Google's hyperscale data centre at Elmina Business Park breaks ground, 2 October 2024
-
[6] The Edge Malaysia: Sime Darby Property awards RM1.26b contract to IJM for hyperscale data centre at Elmina Business Park, 24 October 2025
-
[7] The Edge Malaysia: IJM scores second data centre job worth RM658 mil from Sime Darby Property, 1 April 2026
-
[8] EdgeProp: IJM secures RM658 mil data centre contract in Elmina Business Park, 1 April 2026
-
[9] The Star: IJM secures RM874mil data centre M&E contract, 30 October 2025
-
[10] EdgeProp: From township builder to AI landlord: Sime Darby Property resets game plan, aims for data centre dominance, 26 February 2026
-
[11] The Edge Malaysia: IJM lands another data centre contract at Elmina Business Park, this time worth RM874m, 29 October 2025
-
Google Puncak Alam campus (Eco Business Park V)
Announced Google, EcoWorld (92.44 acre build and lease); Pearl Computing Malaysia (58.187 acres bought) | Eco Business Park V, Puncak Alam, Kuala Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Part of the programme: Google Malaysia investment 2027 and 2028
- Go-live
- 2027 (EcoWorld build and lease completion target) expected [1][2] February 2025
Google named this park in November 2026. EcoWorld sold 58.187 acres for RM266.1m; 92.44 acre lease, rent up to RM4.8b. MW undisclosed. Exact plot match unconfirmed.
Sources
-
[1] The Edge Malaysia: EcoWorld Bursa filing on land sale and data centre lease to Pearl Computing, 25 February 2025
-
[2] EdgeProp: EcoWorld to sell RM266m land, lease data centre to Google affiliate, 26 February 2025
-
[3] SoyaCincau: Google Elmina data centre is now live: Puncak Alam, Serendah, Port Dickson in the works, 4 November 2026
-
[4] The Star: EcoWorld to benefit from Puncak Alam expansion, 15 July 2025
-
Google Serendah campus (UMW High Value Manufacturing Park)
Announced Google | UMW High Value Manufacturing Park, Serendah, Hulu Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Part of the programme: Google Malaysia investment 2027 and 2028
- Go-live
- Not disclosed
Named by Google in November 2026 as a new campus; no opening date. May or may not be the unnamed hyperscaler job in Bandar Serendah. MW undisclosed.
Sources
-
[1] SoyaCincau: Google Elmina data centre is now live: Puncak Alam, Serendah, Port Dickson in the works, 4 November 2026
-
[2] Malay Mail: Google commits additional US$15b to Malaysia data centre expansion over two years, 4 November 2026
-
Hyperscale data centre, Bandar Serendah
Under construction Not disclosed | Bandar Serendah, Hulu Selangor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Q4 2028 (construction completion target) expected [1][2] November 2026
Sunway Construction contracts of RM1.75 billion (April 2026) and RM1.74 billion (November 2026) for an unnamed hyperscaler. Could be the Google Serendah campus, but no source says so.
Sources differ: Sources do not say whether these contracts are one campus. The Star says works run four years from Q4 2026, while The Edge and The Sun give completion in Q4 2028.
Sources
-
[1] The Edge Malaysia: Sunway Construction wins RM1.74 bil contract to build another data centre in Selangor, 5 November 2026
-
[2] EdgeProp: SunCon secures RM1.74b Serendah data centre contract, 5 November 2026
-
[3] The Star: Sunway Construction unit lands RM1.74bil hyperscale data centre construction job in Serendah, 5 November 2026
-
[4] W.Media: Malaysia enters second wave of data center boom: Analyst, 10 July 2026
-
[5] New Straits Times: Sunway Construction wins RM1.75bil hyperscale data centre contract, April 2026
-
[6] The Edge Malaysia: Sunway Construction wins RM1.75 bil data centre job in Serendah, 17 April 2026
-
[7] w.media: Sunway Construction clinches US$ 657 million data center jobs in Selangor and Johor, 6 November 2026
-
irix Kuching 1 DC @Santubong
Operating irix Sdn Bhd | Santubong, Kuching, Sarawak
ColocationTelco
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Built 2022; Q3 2022 was the target operating date live [1][2] December 2024
Uptime Institute Tier IV design (2021) and constructed facility (2025) certified, per operator. Sits beside the BaSICS cable landing station. No MW figure on a trusted page.
Sources differ: 2022 reports name PP Telecommunication (PPTel) as provider; the operator site and a 2024 report name irix. The link between the two names was not confirmed.
Sources
-
[1] DayakDaily: Tier-IV Data Centre, subsea cables expansion position S'wak as AI data hub, 18 December 2024
-
[2] irix: Sarawak's data centre, 22 June 2022
-
[3] irix: Colocation - irix Kuching 1 DC @Santubong, Page undated, read November 2026
-
[4] Uptime Institute: Uptime Institute Awards: Malaysia, Page undated, read November 2026
-
Iskandar Puteri data centre (Kerjaya Prospek MEP contract)
Under construction Not disclosed | Iskandar Puteri, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Fit-out within eight months of a Q3 2026 start expected [1] September 2026
Kerjaya Prospek RM858m MEP fit-out contract from an unnamed data centre developer (The Star).
Sources
-
[1] The Star: Kerjaya Prospek bags RM858mil data centre contract in Johor, 3 September 2026
-
Kapar data centre land (WG Malaysia VIII)
Planned DayOne | Mukim Kapar, Klang, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
About 157 contiguous freehold acres bought for RM687.89m from Maybulk, Eonmetall and Leader Steel units for IT infrastructure. Conditional; completion expected 2H 2026. DayOne link per EdgeProp.
Sources
-
[1] The Star: Maybulk, Eonmetall and Leader Steel sell Kapar land for RM687.9mil for IT infrastructure project, 19 March 2026
-
[2] EdgeProp: AI land rush: DayOne's 157 acre Kapar play signals data centre shift towards Klang Valley, 6 July 2026
-
[3] EdgeProp: RM687.9 mil Kapar land assembly highlights new playbook for securing large industrial sites, 6 August 2026
-
KNBDC Quantum Edge site
Planned KNBDC Malaysia Five Sdn Bhd | Quantum Edge industrial park, Kulai, Johor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Conditional land sale signed April 2026. Buyer described only as a regional hyperscale data centre specialist, with parent and home country not stated. EcoWorld land sale of RM280.8 million for 49.59 acres, due to complete in the first half of FY27 (The Star).
Sources
-
[1] The Star: EcoWorld nets RM907mil from DC land sales, 28 April 2026
-
[2] EcoWorld: EcoWorld sells 49.588 acres at QUANTUM Edge, Kulai to a hyperscale data centre operator, for RM280.8 million, 25 April 2026
-
Kota Petra Green Technology Park
Planned Not disclosed, Zecon Berhad (land owner), jointly developing with Sarawak Data Centre Park | Kota Petra Green Technology Park, Sarawak, reported near Kuching, Sarawak
AI or GPU focused
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
3,000 acres with six AI data centre sites planned; October 2024 MoU. Its 300MW solar and 600MWh battery are power plant figures, not data centre load.
Sources differ: May overlap with the Sarawak Data Centre Park entry, since that name appears as co-developer here. Sources do not confirm they are one campus.
Sources
-
[1] W.Media: 3,000-acre Sarawak tech park to host AI data centers, 24 October 2025
-
Kuching AI Data Campus
Planned Not disclosed | Tanjung Embang, Kuching, Sarawak
AI or GPU focused
- Capacity
- Not disclosed
- Investment
- Part of the programme: SoftBank proposed AI and data centre investment
- Go-live
- Not disclosed
State-led public-private partnership on 405 hectares, first phase 120 hectares. Premier said in October 2026 it is still at planning stage; investor unnamed by him, amount undisclosed.
Sources
-
[1] The Star: Kuching AI Data Campus to drive Sarawak's AI push, 6 October 2026
-
[2] Lowyat.NET: Sarawak Planning AI Data Campus In Tanjung Embang, 4 May 2026
-
[3] Malay Mail (Bernama): Abang Johari confirms AI data centre plan in Sarawak under US$50b investment, 26 October 2026
-
Maxis Business Central Data Centre
Operating Maxis, Maxis | Cyberjaya, Selangor
TelcoColocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
MW not disclosed. Listed on Maxis's current business site.
Sources
-
[1] Maxis Business: Data centre, Page undated, read November 2026
-
Maxis Business Urban Data Centre
Operating Maxis, Maxis | Sungai Besi, Kuala Lumpur
TelcoColocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
MW not disclosed. Listed on Maxis's current business site.
Sources
-
[1] Maxis Business: Data centre, Page undated, read November 2026
-
MCMC Data Centre
Operating Malaysian Communications and Multimedia Commission, Malaysian Communications and Multimedia Commission | Cyberjaya, Selangor
Government
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Status is based on an Uptime Institute Tier III constructed facility certification; the undated listing does not itself say the site is live. No MW published.
Sources
-
[1] Uptime Institute: Uptime Institute Awards: Malaysia, Page undated, read November 2026
-
Microsoft land, Nusa Cemerlang Industrial Park
Planned Microsoft, Microsoft Payments (Malaysia) | Nusa Cemerlang Industrial Park, Pulai district, Johor Bahru, Johor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
22.5 acres bought from Crescendo for MYR 119.8 million, closing expected by Q2 2027. No development plan disclosed for the parcel. Link to US$2.2 billion unstated.
Sources
-
[1] Mingtiandi: Microsoft Buys Johor, Malaysia Data Centre Site From Crescendo, 29 January 2025
-
Microsoft site, Eco Business Park VI
Announced Microsoft, Microsoft Payments (Malaysia) | Eco Business Park VI (QUANTUM Edge), Senai, Kulai district, Johor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
EcoWorld sold 123 acres to Microsoft for RM402.3 million, announced June 2024 for a sizeable data centre. No MW or construction evidence found. Newest evidence is over two years old.
Sources
-
[1] Mingtiandi: Microsoft buying Malaysia data centre site from EcoWorld, 13 June 2024
-
[2] EcoWorld: EcoWorld sells 49.588 acres at QUANTUM Edge, Kulai to a hyperscale data centre operator, for RM280.8 million, 25 April 2026
-
[3] EdgeProp: EcoWorld sells land in Iskandar Malaysia to data centre firm for RM402m, 11 June 2024
-
[4] Mingtiandi: Microsoft Buying Malaysia Data Centre Site From EcoWorld, 13 June 2024
-
MyTelehaus Petaling Jaya data centre
Announced MyTelehaus, Lum Chang Tien Wah Property Sdn Bhd | Section 13, Petaling Jaya, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- RM115 million, Total capital commitment of the land owning joint venture; excludes MyTelehaus fit out [1][2] January 2026
- Go-live
- Not disclosed
Built on 1.61 of 3.22 acres, leased to MyTelehaus for 30 years. Phased; capacity and schedule not disclosed.
Sources
-
[1] The Star: Tien Wah JV to develop data centre in Petaling Jaya with MyTelehaus, 7 January 2026
-
[2] EdgeProp: Tien Wah, Singapore-listed Lum Chang JV to develop data centre in Section 13, Petaling Jaya, 8 January 2026
-
[3] W.Media: Lum Chang inks deal with MyTelehaus to build data center in Petaling Jaya, Malaysia, 8 January 2026
-
Nilai green data centre (name not disclosed)
Under construction Not disclosed | Nilai, Negeri Sembilan
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Menteri Besar told the state assembly in April 2025 that land matters were settled and earthworks had begun. Developer never named in sources found.
Sources
-
[1] The Star: Two data centres under development in Negri Sembilan, says MB, 28 April 2025
-
[2] W.Media: Negeri Sembilan's first two data centers construction on track, 30 April 2025
-
[3] W.Media: Why Negeri Sembilan is the next DC hotspot in Malaysia, 3 June 2026
-
Oracle Cloud Malaysia West 2 (Kulai) region
Operating Oracle | Kulai, Johor
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Part of the programme: Oracle first public cloud region in Malaysia
- Go-live
- 2 February 2026 live [1] February 2026
Oracle names only Kulai, not a facility. One availability domain. Oracle does not state that this is the region funded by its US$6.5 billion plan.
Sources
-
[1] Oracle: New Region in Kulai, Malaysia, 2 February 2026
-
Pahang AI data centre for agricultural products
Planned Pahang State Development Corporation (PKNP), Pahang State Development Corporation (PKNP) | Pahang, site not named, Pahang
GovernmentAI or GPU focused
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Implementation expected to begin January 2026 expected [1] January 2025
Announced by the Menteri Besar in January 2025. No report found confirming the January 2026 start.
Sources
-
[1] The Star: Pahang to develop AI data centre for agriculture, says MB Wan Rosdy, 16 January 2025
-
Poseidon Tier IV data centre, Aeropod
Announced Poseidon Technologies, Poseidon Technologies with Permodalan Risda (PRB) | Aeropod, Tanjung Aru, Kota Kinabalu, Sabah
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- RM119 million [1] October 2023, Older figure
- Go-live
- Expected by July 2024 (2023 report); no evidence it was met expected [1] October 2023
Evidence is over two years old and the target date has passed. No source found confirms construction or completion. MW not disclosed.
Sources differ: A May 2025 Borneo Post article mentions an upcoming Tier III Borneo Data Centre in Kota Kinabalu. Whether that is this project is not confirmed.
Sources
-
[1] Developing Telecoms: Tier IV data centre planned for Borneo, 3 October 2023
-
[2] Borneo Post: Sabah, Sarawak fast emerging as key digital infra hubs, 18 May 2025
-
Sarawak Data Centre Park
Planned Netrunner Sdn Bhd | Sarawak, site not stated, Sarawak
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Completion by 2030 (target) expected [1][2] October 2024
Electricity MoU between Syarikat Sesco and Netrunner in October 2024; AIZO Bhd signed an MoU on joint development. Billed as a Tier IV hub. Evidence is two years old.
Sources differ: May overlap with Kota Petra Green Technology Park, where Sarawak Data Centre Park is named co-developer. Sources do not confirm they are one campus.
Sources
-
[1] Sarawak Energy: SESCO signs MoU with Netrunner Sdn Bhd for Malaysia's first Tier 4 data centre, 16 October 2024
-
[2] MIDA (The Star): SEB to power Sarawak Data Centre Park, 21 October 2024
-
Sarawak hyperscale data centre project, Samalaju phase
Planned Not disclosed | Samalaju Industrial Park, Bintulu, Sarawak
Hyperscaler, own use
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Single press feature says the state-driven project starts its first phase in Samalaju with 38,000 servers. No operator, MW, cost or date given.
Sources
-
[1] Sarawak Tribune: Building The AI Backbone In Sarawak, 9 November 2025
-
SDEC Data Center
Announced Sarawak Digital Economy Corporation Berhad | Kuching, Sarawak
Government
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Listed by Uptime Institute with Tier III design certification only, so being built or live is not shown. The listing gives no date. No MW found.
Sources
-
[1] Uptime Institute: Uptime Institute Awards: Malaysia, Page undated, read November 2026
-
Strateq DC1 Petaling Jaya
Operating Strateq | Petaling Jaya, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
About 88,000 sq ft, Rated-3, per the operator. MW not published.
Sources
-
[1] Strateq: Data Centre Location Guide: Klang Valley, Malaysia, 8 October 2026
-
Strateq DC2 Shah Alam (i-City)
Operating Strateq | i-City, Shah Alam, Selangor
Colocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
About 24,000 sq ft, Rated-3, per the operator. MW not published.
Sources
-
[1] Strateq: Data Centre Location Guide: Klang Valley, Malaysia, 8 October 2026
-
Tera Data Centers Eco Business Park 7 site
Planned Tera Data Centers, Tera Data Centers | Eco Business Park 7, Mukim Jimah, Port Dickson (Malaysia Vision Valley 2.0 Parcel C), Negeri Sembilan
Type: Not disclosed
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Not disclosed
Land bought from Eco Business Park 7 Sdn Bhd. The Edge says no details of the planned project were given. Land price only for 221.67 acres: RM1.013 billion.
Sources
-
[1] W.Media: Tera Data Centers buys 221.7 acres Negeri Sembilan land in US$ 250 million deal, 22 September 2026
-
[2] The Edge Malaysia: Eco Business Park 7 sells land to Tera, 22 September 2026
-
[3] The Star: Negri Sembilan primed for next phase of growth, 8 October 2026
-
TM Klang Valley Core Data Centre
Operating TM Global (Telekom Malaysia), Telekom Malaysia | Cyberjaya, Selangor
TelcoColocation
- Capacity
- Not disclosed
- Investment
- Not disclosed
- Go-live
- Unveiled April 2019; phase two targeted for 3Q 2025 live [1][2] February 2025
KVDC-only MW not disclosed. Phase two adds about 20MW IT shared with Iskandar Puteri in Johor, so it is not recorded as site capacity.
Sources
-
[1] Telekom Malaysia: TM One unveils its latest state-of-the-art Klang Valley Core Data Centre, 29 April 2019
-
[2] MIDA: Second phase of Cyberjaya and Iskandar Puteri data centres to achieve commercial ops in 3Q: TM, 25 February 2025
-
[3] Telekom Malaysia: TM Global expands data centres in Cyberjaya and Johor, 11 November 2024
-
ZDATA Gelang Patah hyperscale data centre
Under construction Computility Technology Sdn Bhd (ZDATA Group), ZDATA Group Co Ltd | Gelang Patah, Johor
Colocation
- Capacity
- Not disclosed
- Investment
- RM8 billion, About RM8 billion [1] March 2026
- Go-live
- First facility targeted end of March 2026, not confirmed expected [1] March 2026
Built in phases. Source gives no MW. No later report found confirming the first facility went live.
Sources
-
[1] Bernama: ZDATA To Launch Malaysia's First GreenRE Platinum Data Centre In Johor With RM8 Bln Investment, 11 March 2026